1. added the closed gates on the MN Historical Society driveways.

    Closed · #151770851
    0
  2. Corrected my earlier error when mapping the new Westminster St access ramp to the Gateway State Trail. It is indeed on the west side, not the east.

    Closed · #151770711
    0
  3. Updated tags to reflect fact that curb ramp and crosswalk is designed for bicycle travel between 7th St NW and Hansen Park

    Closed · #151694334
    0
  4. Corrected some mislabeled campsites at Afton

    Closed · #151207465
    0
  5. Corrected tags for the downtown woonerf https://www.startribune.com/downtown-minneapolis-gets-its-first-woonerf/393491981/

    Closed · #150665980
    0
  6. The sidewalk around the cul-de-sac is also closed at the Stone Arch construction area.

    Closed · #150665504
    0
  7. Discovered the Beltline Blvd exit ramp abruptly ends at the light rail station construction site. Also the stairs on both sides of the bridge are fenced off, not just the east side.

    Closed · #150348887
    0
  8. There are stairs here and then the path goes parallel to the parkway to the crosswalk.

    Closed · #150058140
    0
  9. Cleaned up Stone Arch closure tagging. Deleted Access=yes tag for closed portion. Split way b/c only east end of bridge is currently closed, along with a portion of 6th Ave SE. Closure status of surrounding sidewalks on east side may need updating.

    Closed · #150057718
    0
  10. updated trails and bikeways ground truthed yesterday

    Closed · #148832873
    0
  11. The shared-lane markings and neighborhood greenway designation have been removed from NW Overton St.

    Closed · #148213425
    0
  12. Added greater detail and precision to trails through Como Park and Water Works Park.

    Closed · #147189456
    0
  13. Added info on bike repair stations outside MCTC and 1500 Nicollet and inside the T3 building.

    Closed · #147180336
    0
  14. Plymouth Ave bridge over I-94 fully reopened today.

    Closed · #145416936
    0
  15. https://metrocouncil.org/Transportation/Projects/Light-Rail-Projects/METRO-Green-Line-Extension/Construction/Update.aspx

    Closed · #145416769
    0
  16. Adjusted Green Line level and added crossing nodes to reflect that the Glenwood Ave bridge includes (elevated) level grad crossings of the light rail tracks for both the road and sidewalks.

    Closed · #145004076
    0
  17. Glenwood Ave bridge reopened to vehicle traffic today.

    Closed · #145003895
    0
  18. Would this be an appropriate way to tag the seasonal closure of this trail segment each Dec through Apr? (It gets covered up by a groomed ski trail made from manufactured snow--limited access for fatbikes, but pedestrians are prohibited during winter.)

    Closed · #145003782
    0
  19. Added sidewalks and tags to reflect there is no legal pedestrian crossing across St Johns between 33rd St and the Burnt Bridge Creek Trail.

    Closed · #144513389
    0
  20. Added fence that blocks access between Officer's Row and Mill Plain Park and added tags to the parade grounds gates to try to clarify that bikes and pedestrians can always pass through, but cars can only go through occasionally when it is open.

    Closed · #144512387
    0
Load more
Loading...